Development History
In 1993
In 1993,Shanghai Keda Heavy Industry Group Co., Ltd.(KDHI) was established in Shanghai Qingxi area (Original company name is Shanghai Qingpu Hoisting and Conveying Machinery Co., Ltd.), the main business is the belt conveyor, concurrently engaged i n hoisting equipment(the enterprise covered an area of 2,050m2 with a registered capital of 50000 yuan and a total of 10 employees) .
In 1996
In 1996, the belt conveyor of largest 2500m3 blast furnace in China was successfully developed by KDHI , and with this result has laid the foundation for the development of large-capacity, large-width of the belt conveyor at KDHI.
In 2000
In 2000, KDHI's new factory situated in Shanghai Qingpu Industrial Park (Covered an area of 26,339m2), opening up the road of rapid construction and prosperous development within ten years. (The registered capital was 100 million yuan and the total number of employees was 150 ).
In 2006
In 2006, the second plant of Shanghai Keda Heavy Industry Group Co . , Ltd. was established, covering an area of 40,905m2 , with a registered capital of 100 million yuan and a total number of 350 employees. The enterprise had belt conveyor production scale of 500 million yuan annually.
In 2007
In 2007,KDHI contracted with Shanghai Luojing Ore Terminal Harbor for belt conveyor phase II project, the equipment adopted VFD soft start-up technology. The design of belt conveyor was developing in a new direction of saving more energy and friendly environment.
In 2010
In 2010, the longest pipe conveyor in china was independently developed by KDHI.(Belt conveyor use in GuizhouNayong Power Plant,L=7100m,φ=400mm)
In 2012
In 2012,Brazil Vale ORE port belt conveyor system(phase I) was completed. With excellent product quality and well-deserved reputation,KDHI has been recognized by many international customers.
In 2013
In 2013, Shanghai Keda Heavy Industry Group Co., Ltd. and Datong Coal Mine Gro up established Datong Coal Mine Group Keda Equipment Manufacturing Co., Ltd. which opened a new chapter for KDHI to comprehensively enter the coal market.
In 2015
In 2015, the third plant of Shanghai Keda Heavy Industry Group Co., Ltd. was established, covering an area of 31,862m2. The registered capital increased to 160 million yuan, and the total number of employees was 505. The enterprise had belt conveyor production scale of 1 billion yuan annually.
In 2015
In 2015,the largest ore belt conveyor was developed for Vale,Brazil.(B=2400mm,Q=23500t/h)
In 2018
In 2018, the langxi manufacturing base of KDHI was officially put into use. It only took 6 months from start build to put in to service, which reflects the speed of KDHI. (The enterprise covered an area of 345,800m2 and the total number of employees was 662. The enterprise had belt conveyor production scale of 20 billion yuan annually.)
Future
In future, KDHI shall satisfy the customers as the target, build a first-class global brand,provide the best bulk material handling system to the world.